This feasibility study was produced during my internship at Perkins Eastman in Summer 2020. The study proposes a possible use and general design idea that could be used to redevelop an industrial site in Pittsburg. The proposal includes the adaptive reuse of the old industrial building on the site as well as defines new pattern movements through the site with a system of courtyards and pathways. The height development responds to the surroundings as well as the zoning regulations. Through the choice of the materials, the building can connect to the surroundings while keeping its modern feel.

Other Projects

Back to Top